Multifamily

City Club groundbreaking reinvents Hereford House site

The $76 million City Club Apartments Crossroads mixed-use community broke ground ground Wednesday, signaling new life for the landmark Hereford House site at 20th and Main streets in Downtown Kansas City.

Integrated into the historic Midwest Hotel, the 7-story multifamily building will include 283 apartments and penthouses and feature international design, rooftop dining, an outdoor theater, and 50 floor plans.

"Kansas City is proud to be home to the next exciting development from City Club Apartments," Kansas City Mayor Sly James told attendees at the groundbreaking.

City Club Apartments has retail and restaurant tenants lined up for the project, with announcements pending. City Club has $500 million currently under development in more than a half-dozen U.S. markets.

Summit Square ribbon cutting celebrates record leasing activity

NorthPoint Development and project partners officially cut the ribbon Thursday at Summit Square, a 308-unit luxury apartment complex located within Lee’s Summit’s thriving Summit Tech corridor.

Summit Square includes seven buildings and a clubhouse with outdoor amenities such as outdoor terrace with salt water pool, custom grilling station and covered veranda with a gas fireplace. Indoor clubhouse amenities include a lounge, kitchen/gathering space, fitness center and spinning studio, salon, massage room, media room and conference room.

Neighbors Construction served as general contractor for Summit Square, its 14th project for NorthPoint. NSPJ Architects provided design and architecture services.

"NorthPoint and NSPJ have once again outdone themselves with the design of this property and it shows by the record-breaking lease-up we have witnessed. It's truly amazing,” said Aaron Neighbors of Neighbors Construction.

Summit Square is on track to be the fastest lease-up of any project Neighbors Construction has built for NorthPoint, with five of the seven delivered buildings 90 percent leased. 

“Our residents are raving about the quality of the product, spectacular amenities, the outstanding management team and this amazing location,” Community Manager Pam Lakey said. “In my 27+ years on site in the Kansas City apartment rental market, I have never been a part of something this special.”

You can check out photos of the project’s progression since construction began in December 2016 here by heading to the project page on Neighbors' website. More information at www.summitsquarekc.com.

 

Lenexa's The District mixed-use offers case study on cold-formed steel construction

Construction has hit the midway point for the multifamily portion of The District at City Center, a mixed-use project that adds luxury apartments, retail and office space to the Lenexa City Center development area at 87th Street Parkway and Renner Boulevard. 

The multifamily portion of The District includes 175 units and serves as the region’s first suburban apartment-over-retail project constructed of cold-formed steel. General Contractor Haren Laughlin Construction (HLC) is touting the benefits of the product, which uses prefabricated steel studs to shorten construction times and eliminate on-site labor while improving fire safety during construction and throughout the life of the building.

“The owners wanted to build something that they could sustain for longer than what a wood structure is going to give you, so they brought us to the table and we put together a proposal and really dove into what it was going to take - the parts and pieces - to get this built,” said Matt Fisher, pre-construction manager for HLC. 

HLC, along with design partner Klover Architects, met with potential subcontractors and chose Dahmer Contracting Group led by Dusty Dahmer because its bid was the most competitive and cost efficient. By using an "off-the-shelf" metal stud system, Dahmer said his team was able to tighten the margins so the project made financial sense for co-developers Copaken Brooks and EPC Real Estate Group. 

“The difference between wood and metal framing used to be a bigger spread, and the market’s gotten so much more efficient, so now the difference is a lot smaller,” Dahmer said. “There was a steep learning curve at the beginning of the project, but now we are cruising." 

Reuben Hamman, HLC project manager, said steel framing makes for a safer and cleaner construction site.

“It’s a lot safer product to install because everything we are building is off of a slab, so we are not three stories in the air in a multifamily area swinging stuff around,” Hamman said. “On the job site, it’s just metal and concrete, so there’s not much to clean up. The waste has been minimized and everything we do throw away is recyclable.”

Because cold-formed steel is still more expensive than wood, it isn’t likely to overtake traditional wood framing, but HLC Vice President Jeff Wasinger believes there’s plenty of potential for growth in higher-end multifamily construction.

“We think for a small premium, apartment developers get a longer lasting, better quality, safer structure,” Wasinger said. “The end result is going to be above everyone’s expectations.”

In additional to luxury residential apartments, The District adds 45,000 square feet of office and 35,000 square feet of retail space to the existing 800,000-square feet of developed space at Lenexa City Center. 

The full project team includes EPC Real Estate Group and Copaken Brooks, co-developers; Klover Architects, architect; Studio A Architecture, residential consultant; BSE, structural engineer; Latimer Sommers & Associates, mechanical design; Phelps Engineering, civil engineer- private; and GBA Architects + Engineers, civil engineering- public. John Coe and Ryan Biery of Copaken Brooks are handling the leasing for the District. 

Hunt Midwest senior housing expands into Florida, Tennessee

Hunt Midwest is extending its senior housing reach outside the Kansas City region, announcing plans to build an 84-unit assisted living and memory care community in Royal Palm BeachFlorida.

The 76,200-square foot Capstone at Royal Palm will offer residents resort-style living in a secure environment, with Mediterranean architecture and amenities such as fitness center, bistro lounge, sunroom, walking trails, gazebo and dog park.

"To continue our growth in the senior housing space, Hunt Midwest began looking at dynamic markets in the southeast to develop first-class assisted living and memory care communities," said Ora Reynolds, president and CEO of Hunt Midwest. "About that time, the Village of Royal Palm Beach recognized a desire to provide its senior population with assisted living and memory care services in quality projects or risk losing their residents to neighboring communities. The timing was ideal for us to meet that need, which led to our purchase of this highly desirable infill site..."

In addition to the Royal Palm project, Hunt Midwest has signed contracts to purchase land in the fast-growing Nashville, Tenn. suburbs of Mt. Juliet and Gallatin, with plans to develop two additional Capstone communities in that market.

Hunt Midwest has aligned with nationally recognized operating partner Integral Senior Living for the Capstone at Royal Palm. Construction will begin this fall with an opening expected in late 2019.

 

Tuscan design makes a comeback in new Barsto multifamily project

Barsto Construction officially broke ground on The Villas at Ridgeview Falls, a 237-unit luxury apartment complex on the northeast corner of 119th Street and South Ridgeview Road in Olathe.

Developed by J.A. Murphy Group based in Knoxville, Tenn., The Villas at Ridgeview Falls was designed by NSPJ Architects P.A. and will typify a highly detailed, large scale Tuscan Villa through traditional design elements. 

NSPJ brought the vision to life yet maintained "human scale" by using materials true to the original vernacular, according to a release. Visitors will be greeted by lush landscaping at the main entrance, with a single-story club/amenity center just off the main drive for easy access. The rooflines will be sloped to create the sense of a single-family home entrance, opening into a large courtyard that serves as the development's centerpiece.

Additional community amenities include private grilling areas, center pavilion, resort-style pool, fire pit, and fitness trail. Apartments will include large floorplans with luxury finishes, 9-to-10-foot tall ceilings, and 8-foot tall doors. 

Site preparation is underway with plans to go vertical in the first quarter of 2018 and the first units ready for occupancy in the fall. 

This is the third project for the team of Barsto Construction and J.A. Murphy Group, which recently completed the $32 million Metcalf Village Apartments at 162nd Street and Metcalf Avenue.